Ground you can
count on.
Lime-spreading rigs and compaction machinery turning waterlogged gateways, churned tracks, and failing sub-bases into load-bearing surfaces — fixed price, before winter closes in.
Scroll
Service Zones
Every surface.
Engineered to last.
Hover any card to see the specification data. Each service is fixed-price, survey-to-handover.
Technical Specification
Farm Gateways
Lime-stabilized sub-base with Type 1 cap. Survives 200 dairy cow passes per day.
Bearing Capacity
40t axle
Material Depth
300–450mm
Cure Time
48–72 hours
Design Life
25+ years
Technical Specification
Farm Tracks
In-situ lime treatment of existing sub-grade. No muck-away. Machinery on site within 5 days.
Bearing Capacity
30t axle
Material Depth
250–350mm
Cure Time
72 hours
Width Range
3.5–6m
Technical Specification
Yard Hardstandings
Engineered slab on stabilized sub-base. Certified for AHDB farmyard best practice.
Bearing Capacity
60t axle
Surface Finish
Brushed concrete
Cure Time
7 days full load
Min Area
200m²
Technical Specification
Road Sub-Bases
Dynamic cone penetrometer testing and certified CBR report included with every sub-base contract.
CBR Value
15–30% post-treatment
Material Depth
400–600mm
Test Cert
Included
Compliance
SHW Series 600
Technical Specification
Equestrian Arenas
Full drainage design, sub-base compaction, and surface installation. FEI spec available.
Drainage
Permeable membrane
Base Depth
200mm compacted
Surface
Silica sand / rubber
Gradient
1:100 fall
The Engineering
Ground up.
Layer by layer.
Every Stabilize project starts from the sub-grade up. We treat existing soil in-situ — no muck-away, no imported fill — then cap and surface to specification. The cross-section below is what sits under every finished track we hand over.
In-situ lime treatment — no muck-away required
Dynamic cone penetrometer testing at every stage
Certified CBR report included as standard
Stabilized Pavement Cross-Section
Not to scale
Wearing Course
Dense bituminous macadam or compacted Type 1
Binder Course
Bituminous binder or bound granular
Capping Layer
Compacted Type 1 unbound granular
Lime-Stabilized Sub-Base
In-situ treated soil, 3–5% hydraulic lime, CBR 15–30%
Treated Sub-Grade
Lime pre-treatment, reduced plasticity, improved drainage
Natural Sub-Grade
Existing ground — clay, peat, or fill
Finished surface level — traffickable within 72 hours of final compaction
Instant Pricing
Three questions.
One fixed price.
No surveyors, no callbacks, no waiting. Answer three questions and get a ballpark price in under a minute. Lock it for 7 days — we honour it.
Price locked for 7 days — no obligation
CBR certification included in every quote
Machinery on site within 5 working days
What surface are we stabilizing?

Not sure what you need?
We'll come to you.
For projects over 500m², a Stabilize engineer visits your site at no charge — no pressure, no obligation. We walk the ground, take soil samples, and give you a written specification within 48 hours.
Soil assessment
In-situ plasticity index test
Written spec
Within 48 hours of visit
Fixed quote
No variations, no surprises
Minimum project size 500m² for free site visit. UK mainland only.




